EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
thiggins
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (77)
Research
- (4)
-
Completed toolbox...
-
Vans Plans on USB
-
Registered for RV...
-
Ordered Vans...
Workshop
- (2)
-
Built portable wing...
-
Building going well
Empennage
- (3)
-
Wing kit crate date
-
Picked up empennage...
-
Picking up the tail...
Fuselage
- (24)
-
More pix for updates...
-
Been a...
-
Turtle deck and wheels
-
Finally received the...
-
Finally received the...
-
SB-00067
-
Firewall, oil tank,...
-
Lots of stuff -...
-
Roll bar and fuel...
-
Riveted left side...
-
Finally attaching...
-
Left Longeron going on
-
Houston we have a canoe
-
Forward floor pans
-
Fun times on the...
-
Finally putting...
-
More fuselage work,...
-
Working on seat...
-
Flaperon mixer and...
-
Baggage floor, next...
-
Received kit and...
-
Completed Service...
-
Uh oh - fuselage kit
-
Ordered the fuselage...
Firewall
Tail Feathers
Wings
- (36)
-
Wings done, fuse...
-
Near to closing...
-
Completed right,...
-
Right wing assembly...
-
Hung left wing,...
-
Buttoned up left...
-
Left Landing Light...
-
Onto the left wing...
-
Near to closing up...
-
Completed left...
-
Another wing panel
-
Finally skinning the...
-
Prepping for the...
-
Installing landing...
-
ordered finish kit...
-
Running wires , aoa...
-
Flaperons done ,...
-
Right flaperon ready...
-
Right flaperon ready...
-
Started the right...
-
Loctite the tie rod...
-
Finished left flaperon
-
Started skinning...
-
Rear skins going on...
-
Left flaperon ready...
-
Working left flaperon
-
All ribs installed
-
Finished right wing...
-
Installing forward...
-
Rear ribs attached...
-
Wing rib install
-
Debur ribs
-
Work under way on...
-
Received wing crates
-
Vans tells me that I...
-
Ordered wing kit...
Controls
- (2)
-
Adding more media
-
All systems working,...
Avionics
Lighting
Instrument Panel
Landing Gear
- (1)
-
Sent in an order for...
Engine
- (1)
-
Long time no pix
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (4)
-
Covid killed me
-
Changed Target...
-
Ordered even more tools
-
Ordered Tools from...
Builder Name:
Timothy Higgins
-
Project:
Vans - RV-12iS
-
VIEW REPORTS
Total Hours:
1446.1
Total Flight Time:
Total Expense:
$121270.70
Start/Last Date:
Mar 22, 2020 - No Finish Date
Engine:
Rotax 912iS
Propeller:
Ground adjustable 3 blade Composite
Panel:
Garmin G3X and iPad
Friendly URL:
https://eaabuilderslog.org?s=thiggins
Home or Last Project Picture
Mar 29, 2022
Prepping for the skins, install stub spars
- (10 hours)
Category: Wings
Finally received the missing stubs spars and stub spar doublers. Now I can put the skins on.
787F576C-FEC3-495F-9962-414D02C4722D.jpeg
22B53D39-CE21-4EDE-8EF1-26D4CCFDDF8C.jpeg
4472DA3D-F745-4D07-AD4A-A58E0124A9B8.jpeg
4EA07BDB-694D-48FB-88AD-76FA2490C49F.jpeg
58E35524-A2C6-46AF-98FA-E037F609F87D.jpeg
7A641717-DD9C-4ACB-B38B-9E301AA81188.jpeg
94DFEC82-08B1-4A27-9F1A-AD3AC5973409.jpeg
A33EEF28-0139-48A2-B004-15E1A956812C.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.